Wastewater Treatment and Collection System Improvements Project Job 69.38B
The project consisted of a headworks expansion, new diffused...read more » air system, new centrifuge sludge dewatering facility, a new drainage return pump station, and chlorine contact basin modifications. Garett Hattenhauer was the project manager.
« read less
This projected consisted of vacant lot improvements includin...read more »g site grading, demolition and removal of existing features, and construction of a precast concrete screen wall.
« read less
John Brunemeier provided the structural engineering and Tony...read more » Bowser provided the electrical engineering design for this project for architect's Nichols, Melburg, and Rossetto and Owner/Developer JSR Properties. The restaurant features dramatic views of the Sacramento River thanks to an all-glass wall on the west side.
« read less
City of Yreka 2013 Fall Creek Water System Improvements Job 69.33
The project included multiple components: expanding a pump s...read more »tation, adding in-line filtration and treatment capability, new filters, pump station upgrades including remote monitoring and control capabilities, adding a recycling system for backwash containment and processing, upgrading supply lines in the downtown area, and a 2.5 MG storage tank to help equalize flow and supply water during maintenance activities and emergencies.
« read less
PACE provided civil engineering and surveying services for t...read more »he new Dollar General store in Palo Cedro. Troy Jones designed the project site including drainage and utility improvements, and the project was managed by Fred Lucero. The store opened to the public in November 2015.
« read less
City of Redding Arc Flash Study for Water Facilities Job 21.20
Complete Arc Flash Study Report per NFPA 70E for each well a...read more »nd pump station. The report includes a detailed description of each well or pump station, a basic floor plan to scale, electric service and MCC elevations, and analysis of each panel, and an Arc Flash Information Label and floor painting recommendation for each panel.
« read less
PACE provided civil engineering for The Vistas Assisted Livi...read more »ng and Memory Care in Redding. Fred Lucero was the project manager and designed the project site including drainage and utility improvements.
« read less
City of Mt. Shasta Water Meter Installation Project Job 111.50
This project consisted of installing approximately 1,636 aut...read more »omatic-read water meters on existing water services and providing 63 additional and spare meters.
« read less
The project consisted of a 3-story, 106,000-square-foot admi...read more »nistration office and a 3-story, 100,000-square-foot parking structure. The office facility was framed with structural steel. The parking structure was framed with precast, prestressed concrete.
« read less
Win River Casino Expansion & Hotel Project Job 2345.01
PACE provided electrical design and construction services fo...read more »r the new Win River Casino Addition and Hotel Tower Addition. Gifford Construction was the general contractor and Thalden Boyd Emery was the project Architect. The new addition and renovation to the casino added approximately 10,000 square feet to the gaming area while the new three-story hotel is approximately 60,000 square feet with 84 guestrooms and 6 suites. The project was completed in November 2013 with a total construction cost of approximately $40M.
« read less
The Shasta CSD/City of Redding Intertie Pump Station Project...read more » consisted of the construction of a pump station and intertie to the City of Redding's 30-inch Buckeye Transmission Main at the intersection of Bandana Trail and Rock Creek Road
« read less
Redding is home to an assisted living facility that will fea...read more »ture many amenities and provide special secured apartments and grounds for the residents. Completed in late 2007, the 70,000-square-foot facility will feature 84 apartments, as well as common dining and living areas. John Brunemeier provided structural engineering for the $9.3M project. PACE's civil engineering department provided off-site improvement design, site utilities, and grading design including on-site storm water detention. PACE also provided topographic surveys, construction staking, and geotechnical engineering. The project architect was Rowell Brokaw, for owner Redding Assisted Living, LLC, both of Eugene, Oregon.
« read less
Shasta County Elk Trail Water Improvement Project Job 199.77
The Elk Trail Water Improvement Project included 67,000 feet...read more » of water main, two storage tanks, a booster pump station, radio telemetry and control improvements, and modifications to existing treatment facilities.
« read less
Shasta County Crag View WTP Improvement Project Job 0199.81
This $1.4M project consisted of converting the existing wate...read more »r treatment plant into a headworks-only building, installing two new raw water pumps, building a new water treatment plant at the existing storage tank site, recoating a 200,000-gallon storage tank, and installing a new recycle water pipeline.
« read less
The work consists of construction of the following improveme...read more »nts:
• Approximately 700 feet of 24-inch water line
• Approximately 371 feet of 8-inch water line
• Approximately 110 feet of 10-inch water line
• Pump station including two vertical turbine, 25-HP pumps
• Block building
• Electrical controls and instrumentation
• Pipes, valves, meters, and appurtenances complete
« read less